The "Jalan Sibu/ Bawang Assan / Serendeng and Batang Lebaan Bridge" project involved the construction of a vital roadway and a reinforced concrete (RC) bridge spanning 1.3 kilometers. The Jabatan Kerja Raya commissioned this project with a total budget of 260 million. The construction work commenced in 2004 and concluded in 2010.
The primary objective of this project was to enhance connectivity between Sibu, Bawang Assan, Serendeng, and the surrounding areas. The inclusion of the Batang Lebaan Bridge, a significant 1.3 km RC structure, was a key component in ensuring reliable and safe passage over the river.
This project was critical in improving the infrastructure in the region, facilitating better transportation, and promoting economic growth. The civil works undertaken were comprehensive, ensuring the durability and sustainability of the roadway and bridge.
Copyright © 2024 All rights reserved